Overhead Service
Underground Service
Standard underground service utilizes the shortest route possible up to 150 feet – See A below
Non-standard routing has an additional charge of $5 per foot.
Charges
Consumers should consider underground service routing before the installation of a paved driveway and/or septic system.
Underground-Powered Subdivision
- $200 (up to 150 feet)
- $200 + $350 (additional 70 feet) = $550
- $200 + $500 (additional 100 feet) = $700
Non-Underground-Powered Subdivision
- $400 (up to 150 feet)
- $400 + $350 (additional 70 feet) = $750
- $400 + $500 (additional 100 feet) = $900
Change Overhead Service to Underground
- Standard underground rates apply
- Additional $50 charge to remove existing lines
Contact us to schedule a site visit to determine your exact cost.